Brief introduction of Baigou Sewage Treatment Plant Operation Project

WechatIMG533.jpeg


Baigou Wastewater Treatment Plant is located in Baier Street, Baigou Town, Baoding City. The main plant area was put into operation in May 2009. It was put into operation in December 2009. The sewage plant covers an area of 666and has an investment of more than 80 million RMB. It mainly accepts domestic sewage of urban residents, enterprises and institutions and some industrial wastewater.The mainly using the UNITANK+ advanced treatment process.The effluent quality implements the A standard of the first-class standard of the Pollutant Discharge Standard for Urban Sewage Treatment Plants (GB18918-2002), and the effluent is discharged into the Baigou River or used for irrigation and greening.


WechatIMG531.jpeg


Since Delong Environment took over the operation in April 2012, the Baigou Sewage Treatment Plant has operated stably and the effluent quality has reached the standard, which has improved the environment of Baigou River and improved the quality of life of residents in Baigou Town. It has won praises from Baoding Environmental Protection Bureau and Baigou New Town Environmental Protection Bureau and Urban Construction Bureau.


WechatIMG532.jpeg

WechatIMG534.jpeg


Baidu
sogou